The role of the building envelope is to protect the occupants from the external environment and to ensure thermal comfort for them. Unfortunately, external natural elements (sun, wind, rain, snow, etc.) as well as pollution affect the envelope and cause, over time, the deterioration of the components of this envelope.

Building envelope

When we talk about the building envelope, we are referring to all the walls that separate the building from the external environment. This includes not only the exterior facades (walls, exterior cladding , doors and windows, ceilings on the upper floor), but also the roof, the ground floor slab and the foundation walls.

Moisture problem in the envelope

An intrinsic enemy can also attack the building envelope from within, causing its premature deterioration: condensation within the envelope itself. This condensation can be caused by the diffusion of water vapor into the warm air inside, or by air leaks through the envelope.

Water vapor and air leaks

There are therefore two causes that explain the presence of moisture in exterior walls, namely: 1) the diffusion of water vapor and 2) air leaks.

  1. La water Vapour present in the hot air (inside the building), which passes through the envelope, will condense and transform into water droplets when the temperature gradually cools, in the envelope, crossing the layers towards the 'outside. By definition, water vapor is moisture in the air in the form of gas. Water vapor that exceeds the dew (or saturation) point turns into liquid, this is called condensation. Therefore, the installation of a vapor barrier is necessary to prevent water vapor from passing through the building envelope.
  1. Moreover, the air leaks in the envelope carry water vapor towards the interior of the structure also causing condensation. For this reason, the installation of a continuous air barrier is essential to prevent air movement and avoid condensation within the building envelope.

Chimney effect

In the building, during winter, hot air rises to the upper floor by the chimney effect (draft effect) which occurs due to the movement of warm air which is lighter. This movement creates negative pressure – on lower floors – which pulls cold outside air into the building. This is the reason why this situation produces, in the lower part of the building, air infiltrations coming from the outside towards the inside.

This causes the warm, humid air to rise to the upper floor creating high pressure which pushes the warm air outwards through the envelope. To balance the total pressure in the building, warm, humid air passes through the structure to the outside. In this structure, the temperature gradually drops the closer you get to the outside, and the water vapor (in the hot air) condenses as the air cools. If condensation of water vapor reaches the interior of the structure (dew point), this will cause premature deterioration of the structure. Normally, condensation and structural rot are found more in the upper portions of the building, where warm, humid air accumulates.

To illustrate this point, let's take the example of buildings built before the 60s. In these specific cases, the mechanical detachments of the bricks are concentrated more (beef bellies) in the upper parts of the exterior walls. These walls are made of planks and nails fixing the bricks to the planks. Hot, humid air passes through the plank walls to the outside, into the upper part of the building, and the water vapor condenses, causing corrosion of the nails securing the bricks to the planks. Therefore, the bricks move outwards in the upper part.

Vapor barrier and air barrier

It is therefore important to install the vapor barrier on the warm side of the exterior wall and the air barrier on the cold side. These two components are essential for controlling air infiltration and exfiltration through the building envelope, and for preventing condensation within the building envelope and premature deterioration of the envelope structure.

Airtightness of the envelope

Insulation must also be added to the wall to retard air movement within the building envelope. However, initially, particular attention must be paid to the airtightness of the envelope, at the time of construction, that is to say that the air barrier must be well installed, in respecting the details, especially around openings (doors and windows).

When the air barrier is properly installed on the exterior, good energy efficiency can be ensured by minimizing heat loss through the building envelope. Furthermore, correcting deficiencies related to air barrier installation is complicated and costly, as this work requires the removal of bricks or exterior cladding.

The exterior sealing joints, around the devices which pierce the exterior envelope as well as around the doors and windows are also very important to ensure the watertightness of the exterior envelope.

 

Condensation in the building envelope

© Accumulation of moisture and development of mold in the building structure